Liverpool Head Office: 18-20 Harrington Street Liverpool L2 9QA
single page feature image

    Project Details

  • Sector:
  • Services: Civil and structural engineering, CCTV drainage survey, Pre-deomolition survey
  • Client: Archdiocese of Liverpool
  • Location: Liverpool

St. Cuthbert’s Primary School

This project is a single storey new build school in Liverpool, based on the existing St. Cuthbert’s School site, constructed whilst keeping the existing school operational. 

Sutcliffe was involved in this process from the concept design stage up to the tender stage, appointed under Arcadis for the Archdiocese of Liverpool. 

Following the tender stage, Sutcliffe was novated to the contractor, Kier and attended the design team meetings whilst also assisting the client with civil and structural design.

Sutcliffe’s involvement included a new drainage system that complies with the planning framework for sustainable drainage, external works and the structural design of the new single-storey steel frame on piled foundations.